Evogue Townhouses

PROJECT“Evoque” Townhouses

DATE: April, 2015
GENERAL CONTRACTORMaskeen Group
SUB-CONTRACTORGrant Copland, Mainland Engineering

SUPPLIER: Richform Construction Supply Co. Ltd.
PRODUCT: Hardy Shear Panels

This is the first install of Hardy Shear Panels in Canada.

The owner commented that they saved a lot of labor on the job by using the panels.

FACTS: Prefabricated Hardy shear panels are easier to install than site built. Consistent engineered load values. Fabricated in dedicated facility to ensure quality control. Available in widths from 9” – 24”. Preassembled Moment Frames also available.

There are a total of 66 units. The first 8 were completed with Simpson Shear Panels before the obvious cost savings and ready availability caused the contractor to switch to the Hardy Panel. The framers had no concerns or issues with the installation of the all-metal Hardy Panels. (Initial cost of the panels is lower which is more relevant to the GC as the framer usually has it in their contract to install what is supplied so the GC doesn’t care about installation unless it impacts his schedule).

Renfrew Centre

PROJECT: Renfrew Centre
DRIVEN BY LEED STANDARDS, RENFREW CENTRE BALANCES THE HIGHEST SUSTAINABLE PRACTICE WITH TRULY ICONIC ARCHITECTURAL DESIGN.
http://www.renfrewcentre.com/

DATE: January, 2015
GENERAL CONTRACTOR:  Ventana Construction Corporation
SUB-CONTRACTOR: Two Pillars Construction Ltd.
SUPPLIER: Richform Construction Supply Co. Ltd.
PRODUCT: Pacific Paper Tube

SOME FACTS: “Finish Free” Sonotubes were used throughout this project to achieve architectural columns. Tilted columns were required and Two Pillars used their concrete experience to achieve this feat.

Screen Shot 2015-04-10 at 1.20.32 PM
Screen Shot 2015-04-10 at 1.20.22 PM


Steel-Ply Elevator Core
Steve Nash Lougheed Mall

PROJECT: Steve Nash Fitness Centre – Lougheed Mall. Elevator core 

DATE: June 2014
GENERAL CONTRACTOR: Ledcor
SUB-CONTRACTOR: Avante Raise Right Contracting
SUPPLIER: Richform Construction Supply  (Symons Steel-Ply forms)

SOME FACTS: Since there was an existing structure already in place, space was limited. Symons Steel-Ply hand-set modular forming system was chosen for this elevator core as an alternative to gang forms. This was a quick and effective solution for tight quarters forming.

forming

forming1

For over 30 Years, Richform Construction Supply has been number one for all your construction supplies in Vancouver, Burnaby, Coquitlam, Port Moody, Maple Ridge, Mission, Abbotsford, Chilliwack, Richmond, Surrey, Langley, White Rock, Delta, Squamish, Whistler, Vernon, Kelowna, Penticton, Kitimat and Fort St. John, BC.