Tilt-up Projects

South Surrey: Campbell Heights

PROJECT: Starline Windows
Surrey, BC

DATE: September 2015      

GENERAL CONTRACTOR: Marcon Construction
SUB CONTRACTOR: Rfour Construction
TILT-UP PANEL CONTRACTOR: Swing West Construction
TILT-UP SUPPLIER: Richform Construction Supply            

SOME FACTS:

Completed in two separate lifts with over 500 B12 and B14 braces. Footprint: 480,000 sq. ft.

south surrey tilt-up1

south surrey tilt-up6

south surrey tilt-up5

south surrey tilt-up4

Kelowna, B.C.

PROJECT: Kelowna Community Health and Services Centre
505 Doyle Ave Kelowna

 IMG_0153

IMG_0154

DATE: July 2015      

GENERAL CONTRACTOR: Graham Construction
STRUCTUAL ENGINEER: CWMM Consulting Engineers
TILT UP PANEL ENGINEER: Van Den Brink Engineering
TILT-UP CONTRACTOR:   Swing West Contracting
TILT-UP SUPPLIER:  Richform  Construction Supply            

SOME FACTS:

5 Storey Tilt Up Project located in Downtown Kelowna
60ft tall panels
Heaviest panel 107,000lbs lifted with Dayton Superior T110 Lift Insert
Braced with Dayton Superior B14 Brace (42ft Length, 382lbs)
35 Panels casted on limited space on raft slab with two cores.

Surrey, B.C.

PROJECT: Mercana Warehouse;
3250 189th Street Surrey

Rite Tech July 2015

DATE: July 20th 2015    

GENERAL CONTRACTOR: Prism Construction
TILT-UP CONTRACTOR: Rite Tech Construction
TILT-UP SUPPLIER: Richform Construction Supply

SOME FACTS:  83,000 sq. ft. Tilt Up Warehouse with 79 panels. Dayton Superior T110 Lift insert used with heaviest panel being 87,000 lbs. Panel Layout done so efficiently having only 1 stacker panel in the entire job. All 79 panels were lifted in three and half days. An average of almost 23 panels per day!

South Surrey, B.C.

PROJECT: Morgan Gateway Business Park,
Bldg A, South Surrey, B.C.
42,000 sq ft on four floors

20131107_111824
DATE: November 2013

GENERAL CONTRACTOR: Wales McLelland
TILT-UP CONTRACTOR: Bach Construction
TILT-UP SUPPLIERRichform Construction Supply

SOME FACTS:
4 Story tilt; because the footprint of building was fairly small and there were three elevator cores all panels had to be built in casting beds off the slab.

WHAT IS NEW?
Richform T46-02 18″ Spreader Beam with Twin Shackles.  120,000 lb panel with 16 point T110.

270 ton crane.

WHAT IS EXCITING?
The 250,000 volt power lines in the background produce so much energy that the tilt up crew were getting mini shocks.  The crane had to be grounded and the boom was within 20’ of the power lines near this tilt-up project.

 

For over 30 Years, Richform Construction Supply has been number one for all your construction supplies in Vancouver, Burnaby, Coquitlam, Port Moody, Maple Ridge, Mission, Abbotsford, Chilliwack, Richmond, Surrey, Langley, White Rock, Delta, Squamish, Whistler, Vernon, Kelowna, Penticton, Kitimat and Fort St. John, BC.